     The building was a reinforced concrete school building three stories high of U-shape, which was constructed in 1997 and then donated to the school by a real estate company for using in teaching of elementary and secondary levels. The construction was carried out in a hurry during the time that economic recession was about to begin. When looked from outside, structure of the building was in a good condition. But when the school had an idea of adding the fourth story on top of the existing building, which was now deck of the building, drawings of the building were checked in detail. It was found that more than seventy beams which were 7 meters long could not support the new load. Thus, these beams were designed for strengthening with carbon fiber composites to make them be able to carry the new load safely. After the surface of these members was removed in the process of surface preparation, cavities inside the beams along with many cracks were revealed. When strength of the concrete was tested by means of Ultrasonic Pulse Velocity Method and by coring out concrete samples for laboratory testing, it was discovered that many parts of the concrete had low compressive strength and could be considered as unsafe. Before strengthening of the structure with carbon fiber composites but after the defective parts of the structure were repaired, load test was carried out. Results obtained from load test indicated that structural behaviors under the applied loads could be taken as acceptable. Thus, the structure was strengthened in the next step with carbon fiber composites as it was designed for earlier, with some modification made by considering results from load test. After the structure was strengthened, load test was carried out again. Results from load test carried out after strengthening indicated that the structure was able to carry the new load.